From March 10 to March 16, 2025, SMM statistics showed that domestic enterprises won a total of 33 PV module projects, with the winning bid price range concentrated between 0.69-0.8 yuan/W. The weighted average price for the week was 0.69 yuan/W, a decrease of 0.02 yuan/W compared to the previous week. The total awarded procurement capacity was 473.21 MW, a reduction of 32,102 MW compared to the previous week.
SMM March 18 News: During the week of March 10 to March 16, 2025, SMM statistics showed that domestic companies, including Jinko Solar Co., Ltd., LONGi Green Energy Technology Co., Ltd., Chint New Energy Technology Co., Ltd., and GCL Integration Technology Co., Ltd., won a total of 33 PV module project sections, among which 17 projects disclosed installed capacities. This week's procured module models included N-type TOPCon PV modules, among others. The winning bid price range was concentrated between 0.69-0.8 yuan/W, with a weekly weighted average price of 0.69 yuan/W, a decrease of 0.02 yuan/W compared to the previous week. The total awarded procurement capacity was 473.21 MW, a reduction of 32,102 MW compared to the previous week. The significant difference in total procurement capacity between the two weeks was due to large-scale PV module procurement projects, such as those by China Datang Corporation, being concentrated in the previous week, while no projects exceeding 200 MW were awarded this week. The confirmed N-type module procurement capacity during the week was approximately 178.61 MW, accounting for 37.74%.
Key winning bid information for the week: Xuancheng Dongxin Smart Energy Technology Co., Ltd.'s 1.9 MW PV module procurement project (second round), which planned to procure N-type TOPCon modules with a total installed capacity of 1.9 MW and a power rating of 610 W. Hefei Lanlan Electric Power Engineering Co., Ltd. won the bid at a price of 0.72 yuan/W. PowerChina Kunming Engineering Co., Ltd.'s PV power generation project in Banbie, Panguli, and Jitian villages, Yongren County, Chuxiong Prefecture, Yunnan Province, involved the procurement of N-type PV modules with a total installed capacity of 167.56 MW. Chint New Energy Technology Co., Ltd. and GCL Integration Technology Co., Ltd. won the bid at a price of 0.69 yuan/W.